The final consultation on the South Warwickshire Local Plan runs until September 8th. This is the final consultation before Stratford & Warwick District Councils submit the plan to government inspectors.
In Stratford District the plan is built around a bypass, which will facilitate road-dependent development, and likely induce further road travel, including from further development, over its lifespan, driving up carbon emissions. Advocates of the bypass argue it will enable traffic to be taken out of the centre of Stratford and that it will add resilience to the transport system by providing a much needed third bridge over the river. The transport assessments included in the plan suggest that these benefits are imaginary: the amount of building south of the river will actually increase traffic on Clopton Bridge and in the town, and fully absorb the benefits of additional bridge capacity. It therefore seems the sole remaining purpose of the extremely expensive bypass project is to enable development at Long Marston. Warwick District Council have tried to combine their housing allocations with the availability of railway connections and the creation of sustainable transport corridors. Stratford District Council, by contrast, have located most of their housing at places that are nowhere near a railway station, and no sustainable transport corridors have been identified for Stratford District.
Council guidance, including a video, on how to respond to the consultation is available here.
We have written a detailed technical response, which you can download here.
You might also consider the CPRE’s view that a 15 year plan should be developed rather than a 25 year plan, which would lead to a smaller number of houses being included, and the excellent SHAPE site, developed by campaigners south of Stratford.
The purpose of the consulation
As this stage, consultation concerns whether or not the plan is legally compliant and sound, rather than whether or not you like it (though overwhelming opposition might still encourage Councils to withdraw the plan, as happened recently at Southend – so don’t be shy to respond!).
Rather, it is an opportunity for the public to point out, for the benefit of both the Council and the Planning Inspector, ways in which the plan may not be legally compliant or ‘sound’. We have argued in our response that the Sustainability Appraisal is not legally compliant with the SEA Regulations, which govern SAs, and that the plan is unsound on several grounds.
What does ‘sound’ mean here? In addition to legal compliance, there are four tests of soundness by which the plan will be judged:
- Positive planning. This mostly means that the Councils have properly evidenced the need for houses and employment land. We haven’t referred to it much in our response.
- Justification. This isn’t about whether you think the plan is justified or not, but whether the Councils have made an adequate case for their proposals through the technical evidence (which amounts to thousands of pages of documents). We have argued in our evaluation of many of these that the plan is not justified, because the Councils have not adequately understood, studied or demonstrated the consequences of their spatial choices for carbon emissions from transport and transport infrastructure.
- Effective. This is about whether the plan can be effectively delivered in the period set out. We have argued that due to funding uncertainties over transport infrastructure – foremost the Stratford Bypass – there is a high risk a large number of houses cannot be delivered. We have also argued that because of the funding requirements of road infrastructure, there is unlikely to sufficient funds for the sustainable transport projects that are in the plan, and that the Councils’ climate ambitions will not be delivered.
- Consistency with National Policy. We have argued the SWLP proposals are not consistent with key requirements in the NPPF, which guides it, which require development to be located in sustainable locations.
Where to respond
Below is a brief guide to what is in the SWLP consultation document, and our tips as to where you might want to respond. We have added suggested responses to two high priority questions: on DS.2 Spatial Development Strategy, and on ID.4 Stratford-upon-Avon Bypass. Feel free to adopt, edit and submit these responses in your own name, or to draw on them as you feel. The response to DS.2 is a shorter summary of the full report, and refers to a number of points in the document, in addition to Policy DS.2, but it should be fine to submit there, or as a general comment on either Chapter 2 or 3, if you prefer. Note that our responses are over 100 words, meaning you will have to add a summary when you submit online (there is an option to generate this using AI). You can submit using a Word/PDF form, though they ask you to use less than 500 words if submitting in that way. See the consultation page for more details.
There is nothing to comment on in Chapter 1, so we start with Chapter 2:
Chapter 2: Development Strategy
You can comment on the Chapter as a whole, which is a good idea, as the Chapter states strong climate commitments at multiple points, but the SWLP as a whole does not adequately explore these, does not justify the choices made in light of these, and therefore is not likely to achieve them.
Sets out a hierarchy in approaching carbon emissions to minimise, then mitigate, then compensate. This is great, but is not respected in the proposed development pattern, and therefore will not be effectively achieved. Worth commenting on, but you may find it simpler to include mention of it in a general comment on the Chapter as a whole.
This is one of the most important points to respond. The principle behind the spatial development strategy was to locate development near places of employment with access to sustainable travel. But on the Stratford side, the plan delivers a model of road dependent development, with few sites having railway access and plans for major road-building. See below for suggested response:
The choice of spatial option is the heart of the SWLP. It forms the central link between the broader aims of achieving sustainable development and minimising carbon emissions (Vision Statement, Strategic Objective 5) and the specific portfolio of infrastructure projects and sites chosen. The soundness of Policy DS.2, which sets out the spatial option, is thus intrinsically linked to the soundness of the SWLP’s Vision and Strategic Objectives, and to aspects of the policies which set out those infrastructural commitments (especially ID.3, ID.4, ID.5, and certain sites (e.g. LMA, STR.2). Aspects of this comment will thus also be relevant to those polices and sites.
Below, three main faults are identified, which collectively mean that it fails the second, third and fourth tests of soundness, of justification, effectiveness and consistency with national policy, set out in paragraph 36 of the 2024 NPPF. The plan is also legally non-compliant, due to non-compliance of the Sustainability Appraisal with the SEA Regulations.
- First, the ‘Economy and Sustainable Travel’ spatial option has been applied in such a way as to generate outcomes (at least in Stratford District) that are in complete contradiction to it, namely, a portfolio of sites that for the most part are remote from major centres of employment growth, with no railway connection, and which are facilitated by new road infrastructure including an expensive and damaging bypass project. Thus the portfolio of infrastructure projects (ID.3, ID.4) and sites (e.g. but not only LMA, STR.2) are unsound because unjustified. The general aims of the plan, whilst justified, will not be effectively delivered unless significant changes are made. The plan is also inconsistent with commitments to sustainable development in the 2024 NPPF, and thus fails the NPPF’s fourth test of soundness.
- Second, the process of Sustainability Appraisal, at all stages, has systematically failed to account for emissions from infrastructure construction, and emissions that will be generated by transport as a consequence of locational decisions. This constitutes systematic legal noncompliance of the SA (with regard to the SEA Regulations 2004), and partially explains and contributes to the previous failing.
- Third, the bypass will be expensive, with no route yet identified, and no funding package in place. It is therefore a serious risk, meaning around 7,000 houses planned south of the river may also be undeliverable. To the extent that money is spent on these projects, other infrastructure commitments, such as schools, hospitals, and sustainable transport projects are likely not to be delivered. The plan is thus unsound because ineffective.
Contradiction between sustainable aims and road-dependent outcomes
The SWLP expresses a strong strategic orientation to sustainable development, to minimising carbon emissions, and to supporting sustainable transport.
Thus, the guiding ‘Vision’ (p. 26) references ‘sustainable development’, ‘the climate emergency’, and achieving ‘net zero carbon’ emissions, as well as ‘accessible locations that promote active travel’ and provide ‘convenient access to services and facilities by cycling, walking, public transport and private vehicle’. Strategic Objective 5 is ‘Ensuring that new development is resilient to climate change and does not cause a net increase in carbon emissions, taking positive action to achieve net zero.’ (p. 27) In pursuance of this, the development strategy, Economy and Sustainable Travel (DS.2), is supposed to combine two principles: a) locating development near employment centres, so as to minimise commuter travel; and b) locating development in places that favour the use of sustainable travel (Issues and Options consultation document, pp. 63 ff.). Paragraph 2.55 claims that ‘The Development Strategy has flowed from the earliest iterations of the SWLP and reflects its vision of achieving sustainable development whilst strengthening local communities and responding to the climate emergency. It does this by locating the majority of development in places that can be accessed by means other than the private car.’ (p. 36) Policy ID.2 states that ‘Priority will be given to early provision of high-quality public transport, walking and cycling infrastructure to enable sustainable travel patterns from the outset.’ (p. 152). Policy ID.5, Sustainable Transport Accessibility contains strong commitments to prioritise sustainable transport, including commitments that proposals will be supported where it can be demonstrated that they are ‘in sustainable locations where travel distances can be minimised, and the use of sustainable travel modes maximised’ (157), and to the creation of ‘sustainable transport corridors … along key arterial transport routes’ which will ‘utilise improvements to bus, rail and active transport connections to ensure parity between these modes and the private car.’ This is intended ‘to enable the modal shift away from the use of the private car’ (158).
The reasoning behind these principles and aims seems clear, justified, and sound. These aims are, moreover, consistent with national policy, including National Net Zero planning, and the National Decarbonising Transport Plan (which makes ‘accelerating modal shift to public and active transport’ its number 1 strategic priority). They are enshrined in the 2024 edition of the NPPF. where they accord with the Principle in Favour of Sustainable Development (NPPF 11), and with Chapter 14 in general, especially 164.b: ‘New development should be planned for in ways that … help to reduce greenhouse gas emissions, such as through its location, orientation and design’ (NPPF, p. 48). They also accord with numerous passages of Chapter 9, ‘Promoting Sustainable Transport’, especially paragraph 110, which states: ‘Significant development should be focused on locations which are or can be made sustainable, through limiting the need to travel and offering a genuine choice of transport modes.’ (NPPF, p. 31)
However, the portfolio of sites and infrastructure selected for Stratford District is in stark contradiction to these stated aims:
- Of the new settlement locations in Stratford District, only a few have railway connection. This is altogether lacking at major developments at Bidford, Long Marston, Southam, Wellesbourne. The STR.2 to the south of Stratford is on the other side of the river from the train station, and cut off by congestion on the Clopton Bridge, which is not a friendly environment for cyclists. Of the major sites, only those at Henley and the other sites in Stratford might plausibly be seen as having railway connection, and these sites are probably too far from their respective stations to be considered walkable.
- The centrepiece of the spatial strategy and transport infrastructure plan in Stratford District is the building and enhancement of a road corridor from Long Marston, up past the west side of Stratford, and then along the top of Stratford, to facilitate the passage of traffic generated by development south of Stratford (including at Long Marston) to pass the town from south to north, and vice versa. It would seem to make more sense to locate development in the north, at lower cost, with less road construction involved, and likely less carbon emissions. No satisfactory evaluation or justification of this choice is given (see below).
- Policy ID.5 sets out a commitment to creating ‘sustainable transport corridors … along key arterial transport routes’. However, the corridors mentioned in the policy are all in Warwick District. In Policy ID.3, all the major infrastructure projects listed for Stratford District are road building projects, again contrasting with projects mentioned for Warwick District which focus on rail and cycling. This shows a clear orientation of Stratford District towards a road-building strategy, in contradiction to the stated principles of the plan. Little additional work on cycling infrastructure in Stratford District seems to have been done, over and above that already done by Warwickshire County Council as part of its Local Cycling and Walking Infrastructure Plan.
- The opportunity to advance the case for railway reinstatement through to Honeybourne has not been taken up. Key studies were identified in early 2025 which Stratford Council could have led on and had prepared in time for SWLP submission. No work has been done in this direction since.
Because the stated and sound aims of the plan, which concord with national policy, are thus contradicted by this portfolio of sites and infrastructure projects, these decisions (set out in polices ID.3, ID.4, and in the site choices, e.g. LMA, STR.2) fail the second and fourth tests of soundness set out in Paragraph 36 of the 2024 NPPF: justification and consistency with national policy. Because the stated aims, sound in themselves, will as a result not be realised, the plan as a whole fails the third test of soundness, effectiveness. The SWLP is thus unsound on at least three of the four tests of soundness set out in the 2024 version of the NPPF.
Noncompliance & failure of the Sustainability Appraisal
The SA has failed to identify, describe, or evaluate the climate impacts of this spatial strategy, in breach of the SEA Regulations 2004 (Regulation 12.2 and Schedule 2). The SWLP is thus legally non-compliant. Specifically:
- Transport emissions are not assessed: The SA does not evaluate the carbon emissions from the additional car journeys that the road-dependent developments will generate (with the exception of the deeply inadequate Bioregional reports, which additionally, do not consider alternative sites). Instead, it treats all new settlements as identical, ranking them solely by housing numbers. Carbon footprinting evaluations in the Sustainability Appraisal for Policies ID.3 and ID.4, and for New and Strategic Sites, which only consider emissions from the construction and operation of houses are inappropriate and only conceal the omission, as it is precisely these emissions arising from the impact of locational decisions on transport behaviours that the Council can exert most control over.
- Infrastructure emissions are not assessed: The SA does not evaluate the embodied carbon emissions from the construction of the Stratford bypass or associated road infrastructure, either in the assessment of policies ID.3 and ID.4, or anywhere else. The claim that these do not need to be assessed because these policies only ‘safeguard’ routes is a legal fiction, as the SWLP makes clear that the bypass is essential to deliver the LMA and STR.2 developments, and the Council is actively seeking funding for its construction. There are likely additional failings of the SA concerning biodiversity, etc, as these impacts are also not assessed at policy ID.3 or ID.4.
- Reasonable alternatives are not assessed: The SA does not adequately assess reasonable alternatives, including alternative sites with better rail connectivity, the reopening of the Stratford-Honeybourne railway line, or spatial options that would reduce car dependency. This is a direct breach of Regulation 12(2)(b).
Carbon footprinting exercises by Bioregional, contained in the technical evidence, are irrelevant as alternative sites are not assessed, and for this reason they could not be used in the sustainability appraisal. They appear to be box-ticking exercises. They also do not use a sensible methodology. See full assessment in the attached analysis by Stratford Climate Action.
Because the SA has failed to evaluate the climate impacts of the chosen spatial strategy, the Council cannot demonstrate that this is the most appropriate strategy. The SWLP is therefore unjustified as well as legally non-compliant.
Effectiveness and Deliverability
The bypass and the SWLP’s housing targets are unlikely to be deliverable, leading to failures of the third test of soundness, effectiveness. The delivery of approximately 7,000 homes at LMA and STR.2 depends entirely on the Stratford bypass. This bypass, and associated infrastructure, is a very expensive commitment:
- Cost estimates range from £190 million to £630 million (Atkins-Réalis study). There is an acknowledged 20% chance that costs may exceed these limits, and as cost estimates are not broken down or justified, it is difficult to have confidence in them.
- No route for the bypass has yet been identified, only an indicative corridor. This introduces an additional element of significant cost risk.
- The bypass requires extensive additional infrastructure (multiple new roundabouts and roundabout upgrades, dualling on the A46) to ‘accommodate’ it. This must be added to the cost.
- These costs will be in competition with other infrastructure commitments associated with the sites the bypass is to serve (LMA, STR.2), including schools, doctors surgeries, and upgrades to local road infrastructure. The Growth Development Strategy Paper acknowledges that upgrades to local roads south and east of the LMA development have not been considered.
These costs will not be fundable from developer contributions, and no funding package has been secured. DfT funding is not anticipated to be available in the near future, and cannot be counted on. Stratford District Council is in conversation with Homes England about a contribution or loan, but this is unlikely to cover all of the above costs. Costs will put a very large burden on the funding that is available through developer contributions, given these will also be expected to help fund active and public transport infrastructure. With no clear funding path, there is a high likelihood that the Bypass will not be delivered, and that the majority of the houses at LMA and STR.2 will not be deliverable.
Moreover, the earliest the bypass can be delivered is 2035, and the Council acknowledges there is a real possibility it will not be delivered until 2040. Yet the housing trajectory already schedules significant numbers of homes at LMA and STR.2 before these dates. There is therefore a substantial risk that thousands of homes will not be built as scheduled. As the reason for this early delivery is presumably about securing developer contributions for the bypass, there is consequently a risk to delivery if developers are not willing to undertake development under these conditions.
The Council’s own Strategic Transport Assessment shows that even with the bypass, queuing will occur on Clopton Bridge—‘not previously reported with the existing layout.’ This suggests the development strategy is making congestion worse, not better. Of the three justifications given for the bypass, those pertaining to relieving town centre traffic and increasing transport system resilience in case of a bridge closure are thus vitiated by the increased transport the STA demonstrates the plan will generate. It seems likely that the STR.2 site has been included in order to provide additional developer contributions that can be channeled towards funding the bypass. It thus seems that the bypass is in the plan solely to deliver the development at Long Marston. This does not seem good value for money, and is therefore an additional failure of the second test of soundness, justification.
Summary
The SWLP is not legally compliant because the SA has failed to evaluate the climate and transport impacts of the spatial strategy, in breach of the SEA Regulations. It is unsound for three reasons: It is not consistent with its own stated aims and with national policy requirements re. sustainable transport. It is not justified, as the evidence base does not demonstrate that the chosen sites and infrastructure is the most appropriate. And because it is not effective, as the housing trajectory depends on infrastructure that is uncertain and unfunded. The Plan as a whole, and most centrally policies such as DS.2, ID.3 and ID.4, should be found unsound and the Plan should be re-prepared with a genuinely sustainable spatial portfolio of sites and infrastructure, informed by a proper SA.
A fuller version of these criticisms is uploaded in a report, compiled by Stratford Climate Action, which is uploaded along with this comment.
If you think the Councils have miscalculated the numbers of houses and employment land, this is where to comment. We will not be responding to this, as they seem to have used the prescribed methods, so targets will likely be considered “sound”. But you might still consider it worth registering your dissatisfaction. Most Councillors think the methods are unjustified – should they have banded together with other Councils earlier in the process to challenge the government?
This covers general principles for developments: they should respect local character, provide infrastructure in a timely fashion, etc. It might be worth looking at if you have expertise in planning and can offer advice as to how to improve deliverability (third test of soundness – effectiveness). As we all know, it can be difficult to ensure developers deliver on their obligations.
The remaining policies list: employment land (DS.5), leisure, community and town centre developments (DS.6); smaller housing sites (DS.7) and urban in-building (DS.8). You might want to scan down the list to see if there are any sites that concern you. We won’t be commenting on any of these specifically, and the Inspector likely won’t consider the viability of a small housing site a major issue of soundness. Some of the biggest employment sites have their own Site Policies at the end of the document.
The policies on design codes (DS.19) and densification (DS.20) might be worth considering from a climate perspective. Councils are aiming for higher building densities, but whether they are able to deliver on this is unclear.
Chapter 3: Delivering the necessary infrastructure
If you want to make a general comment on infrastructure strategy, referring to several policies, you could do so here, but that’s probably unnecessary.
These policies require developers to pay for infrastructure to make developments liveable without long car journeys (schools, hospitals, etc, as well as transport infrastructure) and also set out when they should provide it (ID.2). The general tenor of the policies is good, and you might want to say so, but there is no suggestion this will be found unsound, so low priority. If you have some experience in delivering infrastructure and have suggestions on how to make the policies more effective, you could take a look at these.
The infrastructure mentioned here has not been adequately assessed from the perspective of carbon emissions. See details in technical evidence and below. This means the plan is not justified, and not likely to be effective in its climate aims.
This is the centerpiece of the road-dependent development strategy for the Stratford side of the plan. The proposal contradicts the plan’s own principles, as well as key national policies (failure of test 4). Emissions from the bypass are not assessed in the Sustainability Appraisal, or anywhere else (failure of legal compliance to SEA Regs). Funding is not in place for the bypass, meaning it may not be deliverable, and indeed, no route or detailed proposal for the bypass yet exists. Around 7,000 h9uses depend on the bypass, meaning that if it cannot be delivered the plan is unsound (third test). Here is a detailed response you can use or adapt:
This policy, and the plan more generally, are not legally compliant because the Sustainability Appraisal does not conform to the SEA Regulations, which govern Sustainability Appraisals:
- The carbon emissions from building the Bypass and the traffic it will induce, are not identified, described or evaluated, contrary to SEA Reg. 12(2)(a).
- Nor are these emissions compared to the emissions which might be generated by reasonable alternatives, such as building in locations with existing railway access, or reopening the Honeybourne Railway line, as required by Reg. 12(2)(b).
- This contributes to a general failure of the SA to respond to the objectives of the plan, and to provide assessments appropriate to its stage of development, reflecting current knowledge and methods, as required by Reg.s 12(2)(b) and 12(3)(c).
The reason given for not assessing these emissions is spurious: it is claimed that the Policy only protects a route for the Bypass, and does not require its delivery, but the plan cannot be delivered without the Bypass: 7,000 homes at Long Marston and south of Stratford cannot be built without it. It is also clear that the Council is committed to ensuring the Bypass is built, from the broader text of this Policy, from the fact that the Bypass is included in the Infrastructure Development Plan as essential infrastructure (which Policy ID.2 says must be delivered to enable the Plan), from discussions at 8.2 Proposal LMA, in the AtkinsRéalis studies of the project, and from public statements of Stratford District Council.
The policy fails several tests of soundness, i.e. those of justification, effectiveness and conformity to National Policy.
There is a systematic failing in the SWLP to examine and account for the consequences of spatial decisions for greenhouse gas emissions, particularly arising from trip patterns, infrastructure construction and induced road travel. The Councils therefore cannot demonstrate they have succeeded in ‘responding to the climate emergency … by locating the majority of development in places that can be accessed by means other than the private car’ (p. 36) – indeed, in Stratford District the opposite looks to have been achieved. The decisions of the plan thus fail the second test of soundness, justification:
· Sustainability: The Plan commits the Councils to building in locations that facilitate access to employment sites and sustainable travel, in order to reduce the distances people have to drive. Because of the failings of the Sustainability Appraisal, the Council cannot prove that the locations chosen achieve this – and the evidence suggests they do not. At least in Stratford District, most of the large developments are at locations without any access to a railway station whatsoever, and the largest settlement, at Long Marston, requires the building of a bypass to facilitate it.
· Value for money. Three reasons are given for building the Bypass: 1) to enable growth to the south of Stratford (chiefly at Long Marston and around the Banbury Road); 2) to reduce congestion in the town centre and at Clopton Bridge; 3) to build a new bridge over the River Avon to increase resilience, as if an existing bridge failed, currently levels of traffic would mean the town would be gridlocked. The second and third arguments are obviated by the traffic to be generated by development at LMA and STR.2, as set out in the Strategic Transport Assessment. This shows that the Plan would increase traffic on and around Clopton Bridge, meaning no improvements to congestion will be delivered, and that even with a new bridge, the same threat of gridlock would exist. The sole remaining reason to deliver the Bypass is thus to enable development at LMA and STR.2. Given the expenses associated with the Bypass, other development options likely offer better value for money.
There are several ways in which delivery of the current policy, and the SWLP as a whole, look risky, meaning the Plan fails the third test of soundness: effectiveness:
- It is estimated that the bypass could cost up to £630 million with an 80% confidence interval, meaning there is a 20% chance costs could exceed this. As the basis of this estimate is not set out and a route has yet to even be decided on, it is very plausible costs could be higher. As the Strategic Transport Assessment shows, accommodating the Bypass requires additional upgrades to the roundabouts north of Stratford, including upgrading to dual carriageway between two of them. Upgrades to local roads will also be required, and as Annexe C to the Growth Strategy Topic Paper admits, impacts on roads south and east of the Long Marston development have yet to be assessed. The Councils have also committed themselves to another expensive road bridge at Bidford (site BID.1). Funding for this has not been secured, and if it cannot be, and the site therefore cannot be delivered, around 7,000 houses at Long Marston and south of Stratford (and potentially more at Bidford) will not be deliverable. Policy ID.4, and the sites LMA, STR.2 and BID.1 may thus not be deliverable.
- The extent of spending associated with the road-building program makes it likely money will not be available for the sustainable transport measures included in the plan, which are mostly derived from Warwickshire County Council’s Local Cycling and Walking Infrastructure Plan. Policy ID.5 may thus not be deliverable as well.
- Due to the failure to examine carbon emissions arising from siting choices for development, as mentioned above, and the consequent location of development at sites along a pattern of road-dependency, the Plan’s general ambitions to minimise carbon emissions and achieve sustainable development (Vision, Strategic Objective 5, Policies DS.1, DS.2, ID.5) will likely not be achieved either.
The Plan is inconsistent with national policy on multiple grounds, contravening the 2024 NPPF to which it is subject, as well as the government’s Transport Decarbonisation Plan.
1. Paragraph 164 of the 2024 NPPF requires that ‘new development should be planned for in ways that … help to reduce greenhouse gas emissions, such as through its location, orientation and design’. The Bypass, which will induce additional car journeys and lock in road-dependent development for decades, does the opposite.
2. Paragraph 110 states that ‘significant development should be focused on locations which are or can be made sustainable, through limiting the need to travel and offering a genuine choice of transport modes’. The LMA and STR.2 sites are not such locations: they have no railway access, are far from major employment centres, and depend entirely on a new road.
3. The government’s Transport Decarbonisation Plan identifies ‘accelerating modal shift to public and active transport’ as its number one strategic priority, aiming for public transport and active travel to become the ‘natural first choice’ for daily activities. The Bypass does the opposite, encouraging private car use and locking in car dependency for decades.
The emerging NPPF goes further, introducing a presumption in favour of development near well-connected railway stations. The Plan’s reliance on a road-dependent strategy is out of step with this clear direction of travel.
I believe the Sustainability Appraisal should be found non-compliant, and the Plan should be judged unsound. The Councils should withdraw it, and resubmit with a compliant SA, and with a growth pattern that can be justified by a robust assessment of the consequences of spatial decisions for greenhouse gas emissions.
For further detail, please refer to the evaluation of the SWLP published by Stratford Climate Action, which I attach to this submission.
This is a good policy, but is not likely to be effective on the Stratford side as development has not been located near railway stations, as little additional work seems to have been done over and above that already done by Warwickshire County Council (in its Local Cycling and Walking Infrastructure Plan), and as most available effort and money is going to go on road building projects. So it fails the third test of soundness.
There’s not anything obviously wrong with this, but if this is something you have thought about, you might want to give it a read. Let us know if you have any thoughts.
No obvious legal or soundness issues. A Park and Ride was previously provided at the Rosebird Centre, but has been discontinued (after developer funding ceased). It was not a huge success. It might well be questionable whether this will be effective, as a result – are there suggestions you have that might help make it so? But the principle is good.
Chapters 4-7
There are probably interesting comments to make here, but this is a low priority for us. If you have expert understanding of the requirements of the emerging green economy, you might want to take a look – please let us know if you have any thoughts.
If you know the building industry or have architectural knowledge you might want to look at this. Remember that only fundamental failings of soundness will be taken on board at this stage.
We haven’t had time for a full review of this chapter yet, but mostly it seems pretty good. Unfortunately some of the building requirements on developers have been watered down (in response to early feedback from the Planning Inspectorate), and a “where viable” clause has been inserted in several otherwsie very good policies. As developers are likely to challenge the viability of these requirements at every opportunity, it is questionable if these policies can be effective, which would be a failing of soundness (test 3: effectiveness).
There are a few policies on biodiversity here, which will be of interest to many of our members. We have not commented on these yet, as our main respondent’s expertise is not in this area. Much seems good here, but if you have specific comments or concerns please let us know. If you want to take a detailed look, we would advise you to look at the Sustainability Appraisal for specific infrastructure projects, in particular the Bypass. There are also several supporting documents in the technical evidence, but these should be referenced in the SA where relevant. If you don’t have time to read everything don’t worry: you can express your objections as concerns (“I am concerned that X may not be effectively delivered because Y, meaning the plan may fail the third test of soundness on this point”). One suggestion we have had is that people could look at how well the SWLP aligns with and takes into account the Local Area Nature Recovery Strategy. Have appropriate nature corridors been identified and will they be effectively delivered?
Chapter 8: Site Proposals
This chapter includes specific proposals for the main sites (smaller sites are listed above at Policy DS.5-7). People at most sites are up in arms, and the Bidford development in particular seems a bad idea, having no railway link, as well as requiring an expensive new bridge over the river to facilitate it. There are plenty of problems with the scale of other site plans too, but here we will comment only on the sites specifically connected with the Bypass, and which cannot be delivered without it.
This settlement is dependent on a massive road-building project which may not be deliverable, meaning its inclusion is a big risk in terms of the third test of soundness: effectiveness. Carbon impacts from the site have never been adequately appraised, meaning comparison to reasonable alternatives has been systematically inadequate. This is a failure of legal conformity to the SEA Regulations, as well as a failure of the second test of soundness: justification. The site was included in all spatial options considered from an early stage, suggesting its inclusion has been prejudged. See full report, and suggested response to follow below.
Proposal here is for development south of Stratford. Much of the housing here has been added at the last minute, and some of it will be delivered before the Bypass that is supposed to enable it. We believe this may be to secure developer contributions towards the cost of the road. If the Bypass cannot be delivered, this site is unlikely to be deliverable either, due to traffic impacts on Clopton Bridge. The site lacks railway connection, due to difficulties cycling over Clopton Bridge, and the pedestrian/cycling bridge cycling campaigners have been arguing for has not been included in the proposal. More details to follow soon, but there is an excellent website focused on problems with the site which you can visit here. If you live in that area, we would encourage you to get in touch with local campaigners using the details on that website.